Lavos – Rio Maior line 1, at 400 kV

Status Awaiting Environmental Impact Statement

Start Jan 2022

End Dec 2025

REN

Lavos – Rio Maior line 1, at 400 kV

Project Goals

  • The ongoing energy transition depends on an increasingly higher contribution from renewable energies to the production of electricity, accompanied by a decrease in the use of fossil fuels. To enable this entire process, one of the necessary components is the proper connection of new renewable power plants to the grids, ensuring that they meet the necessary conditions for the flow of generated energy.

  • Given the power already allocated for new photovoltaic power plants, namely in the south of Portugal, the current PSEG (Public Service Electricity Grid) lacks capacity to accommodate new generation in this region.

Phases of the project

  • Environmental study: 2022
  • Public consultation: 21 February 2024 to 3 April 2024
  • Environmental Impact Statement: Under review
  • Establishment licence: ----
  • Contact with landowners: ----
  • Construction: ----
  • Completion of the project: Scheduled for 2025

Planned infrastructures

  • Lavos – Rio Maior line 1, at 400 kV

Location

  • Leiria

Union of the Parishes of Leiria, Pousos, Barreira and Cortes

  • Caldas da Rainha

Vidais

  • Porto de Mós

Mira de Aire

  • Batalha

São Mamede
Reguengo do Fetal

  • Rio Maior

Rio Maior
Asseiceira
Union of the Parishes of Outeiro da Cortiçada and Arruda dos Pisões
Fráguas
São Sebastião

  • Santarém

Alcanede e Abrã

  • Alcanena

Union of the Parishes of Malhou, Louriceira e Espinheiro
Union of the Parishes of Alcanena e Vila Moreira
Bugalhos
Moitas Venda
Minde

  • Torres Novas

Pedrógão

  • Ourém

Fátima


Technical Data Sheet

  • Voltage level: 400 kV
  • Approximate length: 72 kilometres
  • Number of supports: 212 supports